The Tragedy of Abandoned Projects – by: Nasir Ahmad El-Rufai

Published:31 Aug, 2012

The Tragedy of Abandoned Projects  – by: Nasir Ahmad El-Rufai
Eleven thousand, eight hundred and eighty-six (11,886) abandoned projects that will cost an estimated N7.78 trillion to complete! These alarming figures are from the report of the Presidential Projects Assessment Committee (PPAC) set up in March 2011, by President Goodluck Jonathan to look into cases of abandoned federal government projects. If the government does not start any new projects, it will take more than five years budgeting about N1.5 trillion annually to complete them all – and that is assuming no cost-over runs or delays!

Ordinarily, these figures should compel the government to accelerate the completion of all ongoing projects, or at least focus on high priority ones. Unfortunately, this has not been the case: Government would rather continue the weekly charade of awarding new contracts or re-awarding old ones at higher prices during its weekly Federal Executive Council (FEC) meetings.
As trillions of naira are being wasted in the name of public projects, it is important to understand issues like how projects are initiated, bid for, negotiated and awarded and why they get abandoned. Who and what are really responsible for abandoned projects? Are poor planning, haphazard procurement, and incompetent project management the key causes or is it financial mismanagement? In spite of mobilization fees already paid, why is nobody held accountable when projects are not completed? How far can the Bureau of Public Procurement or other agencies with requisite mandate go to address the root causes of abandoned projects?
There is a need to briefly examine how projects are initiated and contracts awarded. The first step ought to be conception of projects that fit within a scheme of national vision, strategy and development programs. As we have stated in this column, a 27-page “transformation agenda” tucked away in the website of National Planning Commission falls short of this. This “agenda” is largely inconsistent with the Federal Ministry of Finance medium term sector strategies and budgeting priorities for 2011 and 2012. Most projects are therefore conceived out of nowhere and lacking in internal coherence and consistency with other programs.
Next is to plan and design the project in detail. Assume a road is to be constructed between two locations, the rights-of-way must be surveyed, levels taken, alignment finalized, road designed, and detailed drawings, bills of quantities and other bidding documents prepared prior to inviting pre-qualified engineering contractors to submit competitive tenders. The design development process can take anything between some months to more than a year, while it takes a minimum of 5 months from advertising invitations for bids to presentation to the FEC or other approving authority. This suggests that design and procurement processes for any project ought to start at least a year or two before being budgeted for. This only happens in a few foresighted agencies (MDAs).
Typically, nothing happens until the budget is passed and cash backed, then the implementing MDA begins the fire brigade work of compressing this timeline into a few weeks! Most MDAs wait until projects are included in budget or the budget passed before they start project surveys or design or the procurement process. When an MDA spends at least 5 months on procurement, how much time does the contractor have to execute the project and draw down the funds before the financial year runs out?  This becomes a big issue as MDAs are required by law to return all unspent funds to the treasury by the year end.
To understand why projects get abandoned, we must also understand the pervasive lack of continuation in policies as occupiers of political offices change. Whether it is long term development plans or contracts for critical infrastructure, the repeated practice in Nigeria is that once new people are in office, policies or programs of the previous administration are abandoned. This unwillingness to ensure policy continuity is the root cause of nepotism, corruption and impunity, as officials often re-award such contracts to cronies and generous campaign donors at inflated prices.
In this regard, the “democracies” have not fared better than the military in policy consistency. From Obasanjo’s NEEDS, to Yar’Adua’s Seven-Point agenda, and now, Jonathan’s Transformation Agenda – there has been continuity of policy inconsistency within the same ruling party – and turning projects that would have ordinarily benefited the populace into drain pipes. Critical examples are the N52m Zobe dam in Katsina, commissioned in 1983 by the Shagari regime; not only has several times the original amount been spent on the project, it has not pumped up a single liter of water. And the Ajaokuta Steel Complex which has gulped about N675bn, but still not produced much steel.

When projects are abandoned, the usual reason given is lack of funds, though often it is the pre-contract mishaps already alluded to, and project management deficits that are the fundamental causes. How can funding constraints be blamed for project failures? Should one not wonder why a project is approved in the absence of adequate funds? In fact, section 4 (2) (b) of the Public Procurement Act 2007, states plainly that all procurement shall be ‘based only on procurement plans supported by prior budgetary appropriations; and no procurement proceedings shall be formalized until the procuring entity has ensured that funds are available to meet the obligations and has obtained a “Certificate of ‘No Objection’ to Contract Award” from the Bureau’. Simply put, the law requires that no contract should be awarded if funds are not available for it from the onset!
It is intuitive that abandoned projects fuel corruption and reduce public confidence in governance. The excuse of inadequate or delayed funding may sometimes be contrived.  Such an inference could be drawn as abandoned projects are more often than not re-awarded at unjustifiably over-bloated sums. The increased costs are subsequently justified by blaming inflation, exchange rates, labour and materials cost increases amongst others.
If we intend to check the abnormality of abandoned projects, the relevant laws have to be strictly adhered to.  Section 63 (1) of the Public Procurement Act which states thus: ‘In addition to any other regulations as may be prescribed by the Bureau, a mobilization fee of no more than 15% for local suppliers and contractors and 10% for foreign suppliers and contractors may be paid to a supplier or contractor …’ must be firmly applied.  According to the PPAC, it is not uncommon for contractors to be paid mobilization fees in excess of 50% of the contract sum, often in apparent violation of the law.

While the Executive arm of government is largely to be blamed for abandoned projects, it is not alone. The National Assembly (NASS) is liable as well by unlawfully and unconstitutionally inserting new, unplanned projects into Appropriation Bills expecting them to be implemented. The NASS has joined the executive branch in ignoring the funding needs of existing projects to completion and commissioning. Take the Zobe dam mentioned; does the representative of that constituency not have the responsibility to pursue and ensure the strict completion of projects in his constituency?  If the focus of the government is on development and service to the people, why should officials seek approval for new projects when unfinished ones do not enjoy adequate funding and sound project management?

The Public Procurement Act 2007 established the Bureau of Public Procurement (BPP) with the National Council on Public Procurement (NCPP), as the regulatory authorities saddled with the oversight functions of monitoring procurement and implementation of federal projects across the country.  These statutory functions have been hampered by lots of challenges, including the late passage of the annual Appropriation Acts by NASS and abandonment of the procurement processes by the relevant MDAs if favored bidders turn out to be unsuccessful.

If properly sustained, the Due Process and Certification Mechanism started by the Budget Monitoring and Price Intelligence Unit under Oby Ezekwesili, would have been one of the many benefits of the legislation. This has however not been the case because of policy discontinuities and the cravings of politicians to have unfettered discretion in awarding contracts.

The Federal Government needs to, as a matter of urgency, comply with the provisions of the Public Procurement Act. The government must curb the temptations or pressures to embark on new projects when so many remain uncompleted or abandoned. Desirable projects must be continued irrespective of whichever administration initiated them. The NCPP, which is yet to be constituted, should be urgently inaugurated to superintend the activities of the BPP, as opposed to the current scenario where the FEC usurps the Council’s statutory functions.

As you read this, the Federal Ministry of Finance recently announced the release of N300 billion for capital projects for the third quarter of 2012, bringing the total release for capital projects so far this year to N704 billion out of nearly N1.5 trillion for the year. Most citizens will not feel the impact of this amount because the planning, procurement and project management processes are still fraught with nepotism, corruption and impunity that many projects may end up on the abandoned projects list – after billions have been paid as fungible mobilization advances. Our nation must do better. We must demand that our leaders do better!

Nasir Ahmad El-Rufai

Friday August 31st 2012

 

  • @engranayo

    Sincerely i weep as i read this, i really wonder if our leaders re human beings or Aliens sent to ruin our future. How can sane men n women allow such decadence to occur. Sometimes i can’t comprehend y our leaders indulge in corruption. #GodsaveNigeria

Related Posts

Recent Posts

Abdulmumin Jibrin Warns Against Politicisation of Buhari’s Anti-Corruption War

Chairman, House of Representatives Committee on Appropriation, Hon. Abdulmumin Jibrin has urged members of the National Assembly to support President Buhari’s anti-corruption war.   The Lawmaker’s reaction in a series of tweets Thursday through his verified twitter handle @AbdulAbmJ? comes shortly after opposition Peoples Democratic Party (PDP) caucus in the national assembly withdrew their support for the government of President Muhammadu Buhari.

EFCC Traces Three Mansions To Fayose’s Associate

The Economic and Financial Crimes Commission( EFCC) has traced three posh houses to an associate of Ekiti State Governor Ayodele Fayose. The houses, one in Abuja and two in Lagos, are believed to have been bought with part of the N1.219billion pumped into the 2014 governorship election.  The cash believed to be from the office of the National security Adviser (NSA). Fayose has denied having any dealing with the office while Col. Sambo Dasuki (retd.) was...

Reps Ask EFCC, ICPC To Probe Bala, Others Over Land Swap

The House of Representatives yesterday asked the Economic and Financial Crimes Commission (EFCC) and the Independent Corrupt Practices and other related offences Commission (ICPC) to investigate the former FCT Minister, Bala Mohammed, to examine the likely abuse of financial regulations in the land swap policy he introduced while in office. Also to be probed alongside Bala are the Executive Secretary of the Federal Capital Development Authority (FCDA), Engr Adamu Ismaila and the coordinator, Abuja Infrastructure Investment...

Aisha Buhari Gives Fayose 5 Days To Apologize Or Go To Court

Wife of the President, Aisha Buhari has described the statement by Ekiti State Governor Ayo Fayose which fingered her as an accomplice in the famous Halliburton bribery scandal that landed former U.S. lawmaker, Williams Jefferson in jail as “very wild and unfounded.” She threatened to drag Fayose to court if the statement was not retracted within five working days. The letter emanated from the chamber of Mary Ekpere and Co. The letter signed by Ismaila Alasa and Mary Ekpere...

EFCC Arraigns Senior Air Force Officer For Allegedly Receiving N40 Million, Landrover Bribe

The Economic and Financial Crimes Commission (EFCC) on Thursday arraigned, AVM Rufus Ojuawo, in an FCT High Court, Apo, for collecting N40 million gift and a Range Rover sports car from Hima Abubakar. Mr. Ojuawo, a former Director of Operations, Nigerian Air Force, was arraigned before Justice Mahawiya Idris on a two-count charge. The charge says Mr. Ojuawo while in office in March, 2015, accepted a gift in the aggregate sum of N40 million from...

Fresh Militants’ Attack In Ikorodu Communities

Gunmen suspected to be militants were said to have invaded Igbolomu and Ishawo areas in Ikorodu Local Government Area of Lagos State. According to eyewitnesses who escaped from one of the invaded areas, said the gunmen from the Niger Delta came through water channel since yesterday and started shooting sporadically. Credit: Vanguard

Police Confirm Attack On Shell Facility In Imo

The police have confirmed an attack on a facility belonging to Shell Petroleum Development Company (SPDC) at Awarra, Ohaji/Egbema Local Government Area of Imo. Andrew Enwerem, the police public relations officer in the state, told the News Agency of Nigeria (NAN), in Owerri that the police received report of the attack in the early hours of Thursday. Mr. Enwerem could not disclose the extent of damage done to the facility or the group that carried...

I’m Being Prosecuted For Old Grievances- Dasuki

Former National Security Adviser (NSA), Col. Mohammed Sambo Dasuki (rtd), has told a federal high court in Abuja that he is being punished by some persons at the highest level of power in the country for perceived grievances they had held against him while in active military service many years ago. Dasuki, who did not name any particular person, said the punishment being meted out to him was unfortunate having being borne out of mere vendetta.

Government May Borrow N165b To Pay Civil Servants

With fast declining revenue, the Federal Government said yesterday it is now faced with the prospect of borrowing to meet the monthly civil service wage bill of N165 billion. Minister of Finance, Kemi Adeosun, who had met with protesting workers of her ministry on Wednesday, said in a statement in Abuja yesterday that she does not have any power to pay N1.2 billion, which was not in the budget of the Ministry. The minister said...

Nigerians In UK, Europe Express Disappointment With Referendum Result

A cross section of Nigerians in Europe on Friday expressed disappointment over the decision of the UK in a referendum to leave the European Union. Results released early on Friday by UK authorities indicated that 17, 410,742 Britons voted to leave EU, while 16,141,241 others voted to remain. The Leave campaigners won by 52 per cent to 48 per cent with England and Wales voting...

Militants Threaten To Resume Bombing As New Group Emerges

Niger Delta militants have threatened to re­sume hostilities and have alleged that the two weeks ceasefire agree­ment elapsed without any commitment on the part of the Federal Gov­ernment. The fighters said gov­ernment officials are more interested in grand­standing rather than initiating dialogue with them. In a statement entitled: ‘If you make the peace­ful change that we seek impossible, we will make violent change possible’, a group called Ultimate Warriors of the Niger Delta said if...

New Zealand PM Rules Out Ransom For Citizen Abducted In Nigeria

New Zealand Prime Minister, John Key, on Thursday ruled out paying a ransom as a long-held government standing for a New Zealander abducted a day earlier by gunmen in southern Nigeria. He said at a press conference in Wellington that there was no chance of the government paying a ransom for the release of New Zealander being held hostage in Nigeria. Key said the compromise would only put a bounty on the head of any...

PDP Senate Caucus Withdraws Support For Buhari

The Peoples Democratic Party (PDP) Senate caucus yesterday announced its withdrawal of cooperation with the All Progressives Congress (APC)- led Federal Government. The caucus said the resolution would subsist until the government “ceases the belligerent attitude towards PDP members.” A communiqué read by Senate Deputy Minority Leader Emmanuel Bwacha, endorsed by Senate Minority Leader Godswill Akpabio, Minority Whip, Philip Aduda and Deputy Minority Whip, Mrs Biodun Olujimi, said the resolution was adopted at a meeting...

Shootout In Maiduguri Government House Over Rice Distribution

There was shootout between policemen and soldiers in Maiduguri Government  House Thursday afternoon when soldiers in a truck attempted to forcefully get a share of the rice being distributed to Internally Displaced Persons (IDPs) not living in camps. Reporters gathered that the distribution of rice for the IDPs had started from about a week ago under the watch of policemen in the Government House who are to ensure that the rice is given only to...

FG Suspends Sack Of Resident Doctors, Negotiations Continue

The federal government wednesday suspended the sack of members of the National Association of Resident Doctors (NARD) pending the conclusion of the ongoing negotiations on the matter. This was part of the resolutions reached at the mediatory meeting initiated by the Speaker of the House of Representatives, Rt. Hon. Yakubu Dogara, between the federal government delegation and leaders of NARD. The Minister of Health, Prof. Isaac Adewole, was quoted to have suspended the sack as part...

Gunmen Kidnap Foreign Contractors In Calabar

At least three Australian citizens and one Australian resident, who were contractors for Lafarge cement company have been kidnapped and their driver killed in Calabar, Australian Prime Minister Malcolm Turnbull said on Thursday. There was an initial confusion over the number of victims and nationalities of those involved, as police in gave conflicting accounts, Reuters said in a report. But media reports indicate that three Australians, a New Zealander, a South African and two Nigerians...

AMCON Shuts Senator Bruce’s Companies Over Debt

The Asset Management Corporation of Nigeria on Thursday morning sealed the Abuja premises of Silverbird Galleria belonging to Senator Ben Murray Bruce. The galleria currently houses the Abuja studio of the Radio and Television stations of the senator as well as his other business interests. Apart from Bruce’s companies, the seven storey building also houses other business interest of private individuals such as Shoprite, among others. The building was...

House Of Reps To Conduct Public Hearing On U.S. Sexual Allegations Against Members

The House of Representatives says it will convene a public hearing as part of its investigations into an alleged sex scandal involving three of its members. The hearing will allow Nigerians weigh in on the matter and be transparently engaged in the investigations as promised by the House leadership, Nicholas Ossai, the chairman of the House Ethics Committee, said. The scandal allegedly occurred in the U.S. state of Ohio early June. The allegations were...

Army Debunks Militants Allegation On Plot To Topple Buhari’s Govt

Authorities of the Nigerian Army have said allegation by a militant group claiming that a coup plot to remove the administration of President Muhammadu Buhari were the handiwork of mischief makers since there was nothing like that in the offing. A statement titled ‘Warning to Mischief Makers; Nobody is Planning Any Coup’ and signed by Col Sani Usman said, “The attention of the Nigerian Army has been drawn to another campaign of calumny and distraction by...

Boko Haram Fracturing Over Islamic State Ties- U.S. General

A senior U.S. military general on Wednesday said the terrorist group in Nigerian, Boko Haram, had been fractured internally. Lieut.-Gen. Thomas Waldhauser, the nominee to lead U.S. military’s Africa Command, disclosed this in Washington during his nomination hearing before the Senate Armed Services Committee. He said that the problem in the group resulted from some members splitting from shadowy leader, Abubakar Shekau, over his failure to adhere to guidance from the Iraq and Syria-based Islamic...

Nigeria Cuts Off Gas Supply To Ghana

Nigeria has suspended the flow of natural gas to Ghana over unpaid bills, local media reported on Wednesday, saying an amount of some USD 180 million was outstanding. News outlets reported that Ghana’s state-owned Volta River Authority owes N-Gas, which in turn is in arrears to the West African Pipeline Company, the operator of the conduit that transports gas from Nigeria to Benin, Togo and onwards to Ghana. The latter’s arrears have been building since October...